
Getting Your Home Ready for Interior Painters
An hour or two of prep before painters arrive saves time and money on the job. Here's what we ask DC homeowners to do first, what we handle ourselves and what to plan around.
Plain answers to the questions we hear on walkthroughs, written for the houses and weather of Washington, DC.

Each guide is written from the job site: real temperatures, dry times, prices and the mistakes we see most.

An hour or two of prep before painters arrive saves time and money on the job. Here's what we ask DC homeowners to do first, what we handle ourselves and what to plan around.

Typical DC cabinet painting runs $4,350 to $8,900 per kitchen. Here is what moves that number, how a sprayed enamel finish is built and which parts wear first over 8 to 12 years.

A DC exterior isn't one paint job. Siding, trim, porch floors, iron and decks all wear at different speeds. Here's how many years each surface typically gets and what shortens it.

Most pre-war DC homes still have plaster on wood lath. Here is how to read the cracks, when re-anchoring and skim coating beat replacement, and when drywall really is the better call.

Most condo painting delays come from the building, not the paint. Here's what DC management offices usually ask for, how much lead time to allow and what a unit repaint typically costs.

Most DC homes built before 1978 have lead paint somewhere. Here is what lead-safe prep, containment and cleanup look like on a real repaint, what they add to cost and how to live around the work.

Limewash wears away slowly and lets old brick breathe; paint gives even color but can trap water. Here's how each looks over 15 years on a DC wall and what each typically costs.

Painted or unpainted brick, historic district or not, mortar and moisture: the checks that decide whether a DC rowhouse facade should be painted, limewashed or left alone, with typical costs.

Sheen decides how a wall cleans and how much of its flaws it shows. Here are the room-by-room defaults we use in DC homes, the mistakes we fix most and how to test before you buy.

Mid-April through October is the DC exterior painting window, but the best weeks are narrower. Here is how temperature, dew point and humidity decide each painting day, and when to book yours.

Call any hour. We answer, ask a few questions about the rooms or the exterior, and set a walkthrough time that suits you. You get a written price before any work is booked.